Netflix Put US$2 Million Into Churubusco and Built Latin America's Largest Bluescreen
Netflix shot Contra el huracán at Estudios Churubusco with AI, a 200 m² tank and the largest bluescreen in Latin America. Key takeaways for production companies.
Netflix México premiered «Contra el huracán» on October 23, 2026, its first natural-disaster film, shot at Estudios Churubusco on a set that director Jorge Michel Grau calls «the largest bluescreen in Latin America.» The production required nine months of preproduction and seven weeks of shooting.
The scale of the project explains the industry's interest. According to 2025 figures from the Cámara Nacional de la Industria Cinematográfica (Canacine) cited by Bloomberg Línea, the average cost of a Mexican feature film was MXN$15.04 million, about US$803,000. Netflix did not disclose the film's budget, though its vice president of Content for Mexico, Carolina Leconte, said it cost more than a traditional film. The production brought together 800 people, of whom 500 worked for three years on the special effects, according to Excélsior. The precedent matters: Hurricane Otis made landfall in Acapulco in October 2023, left MXN$61,527 million in damage and affected 80% of the port's tourism infrastructure, according to Cenapred.
The Churubusco set included a 200-square-meter tank with a rolling base and turbines that simulated wind force, according to Bloomberg Línea. Netflix contributed about US$2 million to the complex's modernization, where a hydraulic system was installed to move the vessel. For the finishing work, the team turned to generative artificial intelligence. Grau explained: «The generative AI was for making foam on the sea or matching the behavior of air.» Producer Alexis Fridman noted that Mexican cinema was little accustomed to this type of production. The film, which follows two half-brothers aboard a yacht, remains in Netflix's top 10 in Mexico and also appeared in Argentina's.
For anyone operating production services or renting spaces in Mexico, the data leaves one concrete question: how much of that technical capacity, tank, hydraulic set and effects personnel, remains available for projects without a global streaming budget. The modernization of Churubusco and the experience accumulated by the team are assets the local market already counts on.
This article was written with the assistance of artificial intelligence from verified sources and reviewed by a human editor before publication.